The assembly involves 3 simple steps: (i) prepare the system (e.g. connect battery if needed) and the disposable unit (i.e. take it out of the sterile pouch); (ii) connect the disposable unit to your line and prime it; (iii) connect the disposable unit to the Warrior lite’s base unit. The system will start warming immediately.